Effective July 5, 2022, several Student Affairs offices will transition from their current location on Central Campus to the new Parr Center, destined to become the new front door to Central Campus and its signature building.
Going forward, students requiring enrollment-related or career services assistance can check in at the Welcome Center, located on the building’s Ground Level, to connect with a navigator, advisor, recruiter, or financial aid representative. The college’s other student support resources, including mentoring, student engagement, international programs, and more, will be accessible on Level 1.
See the following chart for new locations:
Department |
New Parr Center Department Location |
Testing Center |
Level 2, Suite 2000 |
Financial Aid |
Ground Floor, Suite 0050 |
International Programs |
Level 1, Suite 1070 |
Student Engagement |
Level 1, Suite 1080 |
Admissions |
Ground Floor, Suite 0050 |
Mentoring |
Level 1, Suite 1060 |
Advising |
Ground Floor, Suite 0050 |
Student Success Navigators |
Ground Floor, Suite 0050 |
Please note:
-
Suites located on the Ground Floor (off of Pease Lane and Elizabeth Ave.) start with “0.”
-
Suites located on Level 1 (off of the Quad and Central High bridge connector) start with “1.”
-
Suites located on Level 2, start with “2.”
-
Suites located on Level 3, start with “3.”
See the Central Campus map for the Parr Center’s location. Should you have questions or if you are not able to find the department you are looking for, please email navigate@cpcc.edu or call 704.330.2722. Thank you!